19.06.2022
Basecamp and Infrastruktur
We are making progress and the mood is good, but the weather with 8°C, fog and sometimes rain is a real challenge.
The containers were set up, set up and the power supply was established. The antennas for the communication link to the hotel are mounted on the containers, also the antennas on the other side of that link, on the roof of the hotel, have been installed and the control centers are being set up.
The lander was transported to its designated location and aligned. The rovers and the drone were inspected for transport damage and functional calibrations and tests were carried out. The test preparations of the individual mobile and fixed systems are still in progress. So, in the next few days we want to prepare the individual demonstrations.